At various times Boss Attachments have had up to 8 Antraquip milling heads operating on the widening and track lowering on the line’s 13 tunnels.
The major benefits on this project :
- Job completed without any issues
- Minimal vibration on the existing structures
- Ability to carry out both lowering and detailed soffit milling operations with 1 tool
- Ability to work right up to existing tunnel foundations when lowering without any compromise to the structural integrity
- Ability to trench in rock not able to be ripped with a 40t excavator single pick
- Backup and industry knowledge transfer from years of experience from the parent company in the USA